Survey and purchase

The surveyor showed up at 8am was finished by 6pm. To summarize there was a laundry list of deferred maintenance that needed to be done(change engine oil, change intake hose, clean clean clean), but all the big items appeared solid. Standing rigging, sails, engine, steering and hull were all good to go. My wife met me with the kids that evening to look over the boat. An hour later we made the plunge and the boat was ours.

IMG_7751.jpeg
Previous
Previous

First sail: stuck, no engine, coast guard

Next
Next

First impressions…